Introduced
Committee
Markup
Reported
Floor
Passed
Enacted
HR.3143 119th Congress

State Planning for Reliability and Affordability Act

Status
In Committee
Sponsor
Evans, Gabe (R-Colorado)
Official Source
Investability
0/100
Stage
COMMITTEE
Related Bills
1
Full Text
4,956 chars
Alive
Yes
Summary
Plain-English summary not yet available for this bill. Check back after our next analysis run.
2025-05-01
Referred to the House Committee on Energy and Commerce.
2025-05-01
Introduced in House
2025-05-01
Introduced in House
119 HR 3143 IH: State Planning for Reliability and Affordability Act U.S. House of Representatives 2025-05-01 text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. I 119th CONGRESS 1st Session H. R. 3143 IN THE HOUSE OF REPRESENTATIVES May 1, 2025 Mr. Evans of Colorado (for himself and Mr. Langworthy ) introduced the following bill; which was referred to the Committee on Energy and Commerce A BILL To amend the Public Utility Regulatory Policies Act of 1978 to add a standard related to State consideration of reliable generation, and for other purposes. 1. Short title This Act may be cited as the State Planning for Reliability and Affordability Act . 2. State consideration of reliable generation (a) In general Section 111(d) of the Public Utility Regulatory Policies Act of 1978 ( 16 U.S.C. 2621(d) ) is amended by adding at the end the following: (22) Ensuring electric reliability with reliable generation facilities (A) In general Each electric utility that employs integrated resource planning shall establish, as part of such integrated resource planning, measures, sufficient to ensure the reliable availability of electric energy over a 10-year period, to maintain— (i) the operation of reliable generation facilities; or (ii) the procurement of electric energy from reliable generation facilities. (B) Reliable generation facility defined In this paragraph, the term reliable generation facility means an electric generation facility that ensures the reliable availability of electric energy by— (i) having operational characteristics to enable the generation of electric energy on a continuous basis for a period of not fewer than 30 days; (ii) having— (I) adequate fuel, or a continuously available energy source, on-site to enable the generation of electric energy on a continuous basis for a period of not fewer than 30 days; or (II) contractual obligations that ensure adequate fuel supply to achieve the generation of electric energy on a continuous basis for a period of not fewer than 30 days; (iii) having operational characteristics to enable the generation of electric energy during emergency and severe weather conditions; and (iv) providing essential services related to the reliable availability of electric energy, including frequency support and voltage support. . (b) Conforming amendments (1) Obligations to consider and determine Section 112 of the Public Utility Regulatory Policies Act of 1978 ( 16 U.S.C. 2622 ) is amended— (A) in subsection (b), by adding at the end the following: (9) (A) Not later than 1 year after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority) and each nonregulated utility shall commence consideration under section 111, or set a hearing date for consideration, with respect to the standard established by paragraph (22) of section 111(d). (B) Not later than 2 years after the date of enactment of this paragraph, each State regulatory authority (with respect to each electric utility for which the State has ratemaking authority), and each nonregulated electric utility shall complete the consideration and make the determination under section 111 with respect to the standard established by paragraph (22) of section 111(d). ; (B) in subsection (c)— (i) by striking subsection (b)(2) and inserting subsection (b) ; and (ii) by inserting In the case of the standard established by paragraph (22) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph (22). after paragraph (21). ; and (C) by adding at the end the following: (i) Other prior State actions Subsections (b) and (c) shall not apply to the standard established by paragraph (22) of section 111(d) in the case of any electric utility in a State if, before the date of enactment of this subsection— (1) the State has implemented for the electric utility the standard (or a comparable standard); (2) the State regulatory authority for the State or the relevant nonregulated electric utility has conducted a proceeding to consider implementation of the standard (or a comparable standard) for the electric utility; or (3) the State legislature has voted on the implementation of the standard (or a comparable standard) for the electric utility during the 3-year period ending on that date of enactment. . (2) Prior and pending proceedings Section 124 of the Public Utility Regulatory Policies Act of 1978 ( 16 U.S.C. 2634 ) is amended by inserting In the case of the standard established by paragraph (22) of section 111(d), the reference contained in this section to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph (22). after paragraph (21). .
🔒 GovGreed Pro · Trading Intelligence on HR.3143 Get Access — $24.50/mo
Loading intelligence layer…
Bill text sourced from GovInfo.gov · public domain · last updated recently.
Plain-English summary, score breakdown, and trading-intelligence panels are GovGreed-original analysis derived from STOCK Act filings, SEC Form 4 disclosures, FEC contributions, and Senate LDA lobbying reports — all publicly filed federal records.
GovGreed is not affiliated with the U.S. Government. Not financial advice.